“1964 – 2014” - 50° Fraste Foundation Anniversary

 fifty



Benito Fracca - President - founded Fraste in 1964,
starting his activity in the mechanical construction.

Soon was developed a first water well drilling rig, and thus began the work in the drilling field.

At that time, the drilling industry was still very traditional, and mainly concerned with mechanical transmission systems. Using hydraulics for its drilling units, Fraste was one of the Italian pioneers of modern drilling.



1964 ENOK


1967 – First Fraste machine


 

1967 en


1967 – The new Factory

Fraste built in Nogara, near Verona its first new factory. Fraste drill rigs began to win fame in the Italian drilling industry; quality became a standard.

 

1978en 

1978 - Fraste expands

Fraste expanded its original headquarters.
The company started attending international trade fairs in Italy, and laid the foundation for entering the foreign market.

1979-84en


1979 – 1984   Time for Expansion

European market opened its doors to Fraste drill rigs.
Fraste won its first international tender, for the supply of thirteen water well drilling units in Bangladesh.


1984

The European market was quickly expanding and Fraste improved construction methods by using new technologies and components. 

 
 

1985 IT EN


1985 

Fraste launched its line of small geotechnical/soil investigation drill rigs, that soon evolved into the new Multidrill line. Fraste's frontiers expanded to include Asia.
Europe became Fraste's "home market" and non-European countries began to be very important.

 

1990 it en


1990 

Fraste created a foreign Distributors network.
Construction and design of the rigs was improved and newer technologies employed.

 1992EN

1992 

Fraste released the first automatic drill pipe loading system, the " Manipulator ", mounted on a FS 300 crawler-mounted rig, the first in a long series.

  

1995 1999en


1995 – 1999 

The Fraste worked hard to meet increasing demand from foreign markets, to make the Fraste brand increasingly international and strengthen its image in the global drilling industry.

  

2000en 

2000 

The company was growing up quickly and manufacturing of the rigs was in accordance with the best international standards. Safety was a priority, R&D as well.

  

2004en 

2004 – New Headquarters and the 40th Anniversary

The year 2004 left an important mark on the history of the company, with the opening of Fraste's new headquarters and celebration of 40 years of activity.
Fraste introduced the "Mito" foundation drilling rig series: a milestone for Fraste's production of foundation rigs.

  

2004 2010 it en

 
2004 – 2008   

Fraste continued to expand on a global level and new technological solutions and new construction criteria were adopted.
Was released the first drilling rig with a double rotary head, and the "Multipurpose" Exploration rigs line.
There was an overall acceleration of productivity in terms of units, customer care and involvement with people in the drilling industry.


2008

Fraste built its second production facility and increased its work force and capability.

 

2011 it en


2011 – Fraste Australia

Fraste Drilling Rigs Australia was established, the Australian branch of the company, especially for the sale of the Multipurpose Exploration rigs.

  

2012 it en


2012 – Dealers

An innovative commercial approach with the international Dealers was taken to improve their knowledge about Fraste drill rigs and the company's global organisation.

 

2013en


2013 – …… The 50th Anniversary is just around the corner.

Taking a quick glance at the long history of Fraste, we see an entity that is always on the move to keep its entrepreneurial mindset in line with the times, where all of the staff are fully committed to the Company Mission: respect for the individual, life values and the environment.

  

2014 en

 
2014 – FIFTY YEARS!

Fraste remains based in Nogara proud of its origins and always has an eye to the future.
Celebrations of the 50° Anniversary will take place during the year 2014 in different locations.



 

Nowadays Fraste is developing a complete and high-quality technological drill rigs range for:

 

WATER WELLS - MINERAL EXPLORATION - GEOTHERMAL DRILLING - FOUNDATIONS - DUAL ROTARY - SOIL INVESTIGATIONS - CORING
CIVIL ENGINEERING - SEISMIC

  

143 it en 

 

All Fraste rigs are designed under innovative and modular system and a wide range of drilling components, accessories and equipment are available, to meet with customer's requirements and to perform with almost all drilling systems.